Led by WBC Boardmember Joel Wolf, this enjoyable ride will start from the Quinlan Community Center parking area at 9:30 am.
The ride will be 42 miles long, with about ½ roadway and ½ trail. The trail is paved most of the way except for 5 mile stretch along the bay, which is a hard packed fine aggregate. (You shouldn’t need large tires to ride.) The ride is very flat with only 500 feet of elevation gain.
Water and public restrooms are available at a couple locations along the ride.
The total ride should take about 3.5 hours to ride, unless we stop for lunch/food somewhere in Willow Glen.
More information: info@walkbikecupertino.org